Hawaii Hotel Renovation Info

Hawaii Hotel Construction and Renovation Information

We have compiled a list of hotels that have renovation or construction projects going on in Hawaii to help you plan your trip. We want to make sure your trip to Hawaii is a peaceful one!
We try to keep updated through the hotel industry, but if you know of any hotel construction or renovations that are not on our list, please let us know via email and we will research it and update the list.  Mahalo in advance!

Island Of Oahu

Construction will begin on the International Market Place in Waikiki. The International Market Place will will be replaced with a Saks Fifth Avenue store which will be connected to another mall.

Hilton Hawaiian Village

The Hilton is currently revamping Lagoon Drive and Rainbow Drive to allow for all vehicles at this time as the Tapa Depot will be closed indefinitely.

This will affect:
- Rainbow Drive-main drive into resort;
- Lagoon Drive between Rainbow Tower/Lagoon Green and Grand Waikikian;
All shops on driveway side of Rainbow Drive and three shops on Lagoon Drive will be occasionally subject to noise.

As the resort is the shape of a soft ‘O’ most rooms fronting the drives and many rooms in the towers except Ali’I will be able to see the renovations looking down.  Additionally, guests passing through the property and traversing from one area to another may experience the barricades and occasional noise.

Work is between 9-5 pm, Mon – Fri, and some Saturdays. Noisy work includes demo equipment for Rainbow/Lagoon Drive

Sidewalks are being kept open and accessible.  Barricades are set up around all construction areas.

Please note that renovation times and dates are subject to change without prior notification.

  • Current Renovations: Rainbow Tower Mural (4/1/2014 – 7/21/2014):

The rejuvenation of the Rainbow Tower Mural restoration is scheduled as follows:

All electrical fixture installation will continue through July 2014.

The Rainbow Tower Ocean Front Corner Units feature the use of two balconies. For the safety and security of our guests, during the Rainbow Mural Renovation the balcony/lanai that faces the ocean will be closed and locked for the remainder of the mural work.  This affects guests staying in the Rainbow Tower Ocean Front Corner Diamond Head View and Rainbow Tower Ocean View Corner Yacht Harbor View.  Balcony/Lanai facing the Ocean ONLY will be closed and locked for the duration of the rejuvenation. The other balcony/lanai will be accessible.

The resort will do everything to minimize guest inconvenience, however, times, days, and noise levels will differ between dates.

Island Of Maui

Mana Kai Maui

The Mana Kai Maui will be performing Emergency Spalling and Repairs on the exterior of the building.

The spalling and repairs work will include repairing electrical conduits, re-pulling electrical wiring, removing lanai carpets, and epoxy repairs. During this period each floor will be closed approximately 2 weeks per floor. There will be some jack hammering, chipping noise.

The renovation hours will be from 8am-5pm, Monday-Friday April 28, 2014 to July 1, 2014.

 

Island of Kauai

Aston Islander on the Beach
The Aston Islander on the Beach wil be doing a roofing enhancement project March 3 thru July 25, 2014. The roofing project will inlcude replacing the roof and Lanai columns
Work will be done Monday thru Fridays 9:00am to 4:00 pm.
Guests will not be placed in the buildings that are undergoing construction

 

 

Malia
Hawaii Fun Trips
1-808-548-8800
Malia@hawaiifuntrips.com


HawaiiFunTrips.com - info@HawaiiFunTrips.com

HAWAII FUN TRIPS
1-808-548-8800
We are a licensed travel agency based in Hawaii. We know Hawaii best.

Mahalo for your business !